WebTaxs

Cincinnati Automation Blog

Compact Inspection and Gaging Systems
Thursday, October 15, 2009

From: Marketing Department @ Cincinnati Automation

Compact Inspection and Gaging SystemsCincinnati Automation releases a new line of Compact Inspection and Gaging Systems designed for small injection molded parts, tube seals, gaskets, o-rings. These pass through inspection cabinets only require about 4 square feet of floor space.

The standard systems include a Keyence machine vision controller with a high speed camera(s) and LCD display. Parts can be manually loaded or transferred from customer’s existing feed systems into the inspection enclosure via an integrated LED back light conveyor. Good parts are blown down a chute out of the cabinet to customer’s bin/box. Bad parts are contained inside of the inspection machine cabinet.

Most systems include a user friendly touch screen HMI for quick and easy part number selection, good, bad and total parts inspected counts.

CA offers a complete line of these pass through inspection systems to process a wide range of part or assembly sizes. Optional items for the inspection systems typically include: vibratory feeder bowls for small component parts, servo or pneumatic pick and place systems for larger part loading, bar code scanner for part number and quantity entry, Industrial PC for pass/fail results data collection, and operator password entry & logging.





 
 
Subscribe To Our Blog

Blog Categories

  • Blogs
    • 07/29/2019 - A Guide to Robotic Inspection
    • 07/25/2019 - Should You Use Vision Systems
    • 07/22/2019 - How automation has improved ph
    • 01/25/2019 - The Benefits of Automated Insp
    • 01/11/2019 - 3 Things You Need to Consider
    • 12/31/2018 - Why Automated Inspection is Es
    • 12/21/2018 - Automatic Gauging Systems
    • 11/12/2018 - Quality control and automated
    • 10/26/2018 - Common recurring mistakes in l
    • 10/05/2018 - Quality control and automated
    • 09/21/2018 - Should You Invest in Automatio
    • 09/07/2018 - To What Degree Does Automation
    • 08/17/2018 - Automotive Industry Embracing
    • 08/03/2018 - Robotic Inspection Systems Are
    • 07/20/2018 - The Era Robo-Vision
    • 07/06/2018 - How Robots Revolutionized the
    • 06/15/2018 - 5 Ways Automation Improved the
    • 06/01/2018 - Why Move Towards Automation?
    • 05/18/2018 - What You Should Know Before Mo
    • 05/04/2018 - Automated Inspection: 4 Ways i
    • 04/20/2018 - 5 Applications of Robotic Auto
    • 04/06/2018 - 3 Advantages of Robotic Inspec
    • 03/16/2018 - The Era of Vision-Guided Robot
    • 03/02/2018 - Quality Control: Significance,
    • 02/01/2018 - Benefits of Automated Inspecti
    • 01/26/2018 - Cincinnati Automation Particip
    • 01/08/2018 - Highlighted project of the Wee
    • 12/11/2017 - Highlighted Project of the Wee
    • 11/13/2017 - Cincinnati Automation Exhibits
    • 10/16/2017 - Highlighted Project of the Wee
    • 09/25/2017 - Highlighted project of the Wee
    • 08/21/2017 - Highlighted project of the Wee
    • 07/17/2017 - Highlighted Project of the Wee
    • 06/23/2017 - Highlighted Project of the Wee
    • 06/09/2017 - Highlighted Project of the Wee
    • 06/08/2017 - Highlighted Project of the Wee
    • 05/26/2017 - Highlighted Project of the Wee
    • 05/11/2017 - Cincinnati Automation Applicat
    • 04/21/2017 - Highlighted Project of the Wee
    • 04/14/2017 - Highlighted Project of the Wee
    • 03/30/2017 - Cincinnati Automation Particip
    • 03/10/2017 - Highlighted Project of the Wee
    • 03/03/2017 - Highlighted Project of the Wee
    • 02/24/2017 - Cincinnati Automation CAD Desi
    • 02/17/2017 - Highlighted Project of the Wee
    • 02/09/2017 - Highlighted Project of the Wee
    • 02/02/2017 - Cincinnati Automation Particip
    • 01/27/2017 - Highlighted Project of the Wee
    • 04/01/2011 - Automated Inspection System de
    • 02/09/2011 - Thickness, Diameter Gaging Sys
    • 01/14/2011 - New Package Inspection System
    • 11/06/2010 - 2D Laser Profile Gaging Machin
    • 09/26/2010 - Kit Inspection Systems for Pha
    • 05/18/2010 - Automated Inspection Systems f
    • 02/09/2010 - New Line of Custom Light Boxe
    • 01/14/2010 - Tube (Run Out) Gaging Machine
    • 10/15/2009 - Compact Inspection and Gaging
    • 07/30/2009 - Assembly and Inspection System
    • 02/27/2009 - New Line of Automated Laser Ga
    • 01/01/2009 - Flexible and Programmable Robo
    • 11/01/2008 - Automotive Parts Assembly, Ins
    • 08/01/2008 - Stabilizer Bar Assembly and In
    • 05/01/2008 - Food and Beverage Inspection S
    • 02/01/2008 - New Line of Automated Assembly
    • 12/08/2007 - Turnkey Gaging Machine Feature
    • 12/01/2007 - Compression Spring Inspection
    • 09/01/2007 - Inspection and Packing of Mold
    • 06/01/2007 - Automated In-line Leak Tester
    • 03/01/2007 - Inspection and Gaging in Harsh
    • 01/10/2007 - Run-Out, Inspection Machine
    • 12/01/2006 - Cincinnati Automation Moves!
    • 10/01/2006 - Laminated Parts AIS
    • 06/01/2006 - Automatic Identification Syste
    • 03/01/2006 - Large Molded Parts AIS
    • 01/06/2005 - Vision Guided Robot for Machin
  • News
Copyright © 2021. Cincinnati Automation Ltd. All Rights Reserved  | 859-371-5070 | info@cincinnatiautomation.com Facebook  Twitter  Google Plus  YouTube  Blog
mangakakalot