Highlighted Project of the Week: Cincinnati Automation Helps Customer with Downed MachineThis week, Cincinnati Automation came in to save the day. A customer called to say they were in a tight spot and needed some on-site support. They had recently installed an inspection system and due to operational issues were forced to move it to a different location in the plant but were now without a vendor to support the system. They also wanted to connect the system in with their network at this point.

Cincinnati Automation Senior Controls Engineer Herb Zingsheim showed up on site and was able to diagnose their situation, needs, and develop a solution. There was a need for some additional hardware and programming, but within two days, Herb had the system back up and running, inspecting their parts as well as now communicating with their in-house network.

If you have a challenge with an inspection system and need onsite support or similar type needs, send an email to info@cincinnatiautomation.com and someone from the sales department will get back to you.




 
 
Subscribe To Our Blog

Blog Categories

  • Blogs
    • 07/29/2019 - A Guide to Robotic Inspection
    • 07/25/2019 - Should You Use Vision Systems
    • 07/22/2019 - How automation has improved ph
    • 01/25/2019 - The Benefits of Automated Insp
    • 01/11/2019 - 3 Things You Need to Consider
    • 12/31/2018 - Why Automated Inspection is Es
    • 12/21/2018 - Automatic Gauging Systems
    • 11/12/2018 - Quality control and automated
    • 10/26/2018 - Common recurring mistakes in l
    • 10/05/2018 - Quality control and automated
    • 09/21/2018 - Should You Invest in Automatio
    • 09/07/2018 - To What Degree Does Automation
    • 08/17/2018 - Automotive Industry Embracing
    • 08/03/2018 - Robotic Inspection Systems Are
    • 07/20/2018 - The Era Robo-Vision
    • 07/06/2018 - How Robots Revolutionized the
    • 06/15/2018 - 5 Ways Automation Improved the
    • 06/01/2018 - Why Move Towards Automation?
    • 05/18/2018 - What You Should Know Before Mo
    • 05/04/2018 - Automated Inspection: 4 Ways i
    • 04/20/2018 - 5 Applications of Robotic Auto
    • 04/06/2018 - 3 Advantages of Robotic Inspec
    • 03/16/2018 - The Era of Vision-Guided Robot
    • 03/02/2018 - Quality Control: Significance,
    • 02/01/2018 - Benefits of Automated Inspecti
    • 01/26/2018 - Cincinnati Automation Particip
    • 01/08/2018 - Highlighted project of the Wee
    • 12/11/2017 - Highlighted Project of the Wee
    • 11/13/2017 - Cincinnati Automation Exhibits
    • 10/16/2017 - Highlighted Project of the Wee
    • 09/25/2017 - Highlighted project of the Wee
    • 08/21/2017 - Highlighted project of the Wee
    • 07/17/2017 - Highlighted Project of the Wee
    • 06/23/2017 - Highlighted Project of the Wee
    • 06/09/2017 - Highlighted Project of the Wee
    • 06/08/2017 - Highlighted Project of the Wee
    • 05/26/2017 - Highlighted Project of the Wee
    • 05/11/2017 - Cincinnati Automation Applicat
    • 04/21/2017 - Highlighted Project of the Wee
    • 04/14/2017 - Highlighted Project of the Wee
    • 03/30/2017 - Cincinnati Automation Particip
    • 03/10/2017 - Highlighted Project of the Wee
    • 03/03/2017 - Highlighted Project of the Wee
    • 02/24/2017 - Cincinnati Automation CAD Desi
    • 02/17/2017 - Highlighted Project of the Wee
    • 02/09/2017 - Highlighted Project of the Wee
    • 02/02/2017 - Cincinnati Automation Particip
    • 01/27/2017 - Highlighted Project of the Wee
    • 04/01/2011 - Automated Inspection System de
    • 02/09/2011 - Thickness, Diameter Gaging Sys
    • 01/14/2011 - New Package Inspection System
    • 11/06/2010 - 2D Laser Profile Gaging Machin
    • 09/26/2010 - Kit Inspection Systems for Pha
    • 05/18/2010 - Automated Inspection Systems f
    • 02/09/2010 - New Line of Custom Light Boxe
    • 01/14/2010 - Tube (Run Out) Gaging Machine
    • 10/15/2009 - Compact Inspection and Gaging
    • 07/30/2009 - Assembly and Inspection System
    • 02/27/2009 - New Line of Automated Laser Ga
    • 01/01/2009 - Flexible and Programmable Robo
    • 11/01/2008 - Automotive Parts Assembly, Ins
    • 08/01/2008 - Stabilizer Bar Assembly and In
    • 05/01/2008 - Food and Beverage Inspection S
    • 02/01/2008 - New Line of Automated Assembly
    • 12/08/2007 - Turnkey Gaging Machine Feature
    • 12/01/2007 - Compression Spring Inspection
    • 09/01/2007 - Inspection and Packing of Mold
    • 06/01/2007 - Automated In-line Leak Tester
    • 03/01/2007 - Inspection and Gaging in Harsh
    • 01/10/2007 - Run-Out, Inspection Machine
    • 12/01/2006 - Cincinnati Automation Moves!
    • 10/01/2006 - Laminated Parts AIS
    • 06/01/2006 - Automatic Identification Syste
    • 03/01/2006 - Large Molded Parts AIS
    • 01/06/2005 - Vision Guided Robot for Machin
  • News
Copyright © 2021. Cincinnati Automation Ltd. All Rights Reserved  | 859-371-5070 | info@cincinnatiautomation.com Facebook  Twitter  Google Plus  YouTube  Blog
mangakakalot